We’re planning a Jazzy Jalisco sync next Friday 2024-10-17T16:00:00Z. There are currently 256 packages ready to sync and no regressions .
If you find a regression when testing, please report it upstream and leave a comment here so we can track it leading up to the sync.
Starting today 2024-10-15T16:00:00Z we’ll hold all rosdistro PRs unless they fix reported regressions.
2 Likes
Hi, please make sure that rcl_logging #123 makes it into the next Jazzy sync. It appears to have been missed in the 2024-10-18 sync.
Regular syncs do not typically include updates to the core packages. The next patch sync will contain it.
Regular syncs do not typically include updates to the core packages. The next patch sync will contain it.
Then consider this a request that either (1) the next Jazzy sync be a patch sync as well or (2) that a simple fix to a significant bug in a core package (it breaks all of the bazel ROS 2 tooling) be an exception to “typically”.
Three months (approximately the interval between prior patch syncs) is a very long time to wait for a two line fix to land in the binary distribution.